AC264
New product
-1 Item Items
This product is no longer in stock
Warning: Last items in stock!
Availability date:
The Turnigy Servo Signal Reverser can be used in line to reverse the signal to a servo.
Spec:
Input Voltage: 3v~12.6v
Signal Type: 760us 1520us (Auto Detect)
Plug Type: JR
Cable Length: 415mm
Weight: 6gram
IF TEMPORARILY OUT OF STOCK
Please CLICK HERE to be notified when this item becomes available again